How EMEC Restores Power

Storm Repairs: Why Some Before Others?

We never realize how much we take electricity for granted until we have an outage, and then we want it back: immediately. Unfortunately, the Cooperative can not always restore power to every one at once. If storms have caused widespread outages, and we know that some repair jobs have to wait for others, how does the Co-op determine which ones get attention first?

For any utility during an outage, the goal is to restore power to the most people possible as quickly as possible. This may mean power is restored to some homes, while a neighboring home goes without power for some time longer. It can appear random, until we see the big picture.

Working outward from the substation, which is the local source of power, our first priority would be any downed or damaged main distribution lines. This is common sense, since without this work, we can not supply the power necessary to know if any of the other repairs have been effective.

If we do not have sufficient manpower to work on two or more main lines at once, the distribution line affecting the most people is repaired first.

When the main distribution lines have been repaired, the next priorities are the tap lines, in order by number of people receiving electricity from each tap.

 